Your browser doesn't support javascript.
loading
Mostrar: 20 | 50 | 100
Resultados 1 - 1 de 1
Filtrar
Mais filtros

Base de dados
Ano de publicação
Tipo de documento
Intervalo de ano de publicação
1.
Nihon Hoshasen Gijutsu Gakkai Zasshi ; 80(4): 385-389, 2024 Apr 20.
Artigo em Japonês | MEDLINE | ID: mdl-38403594

RESUMO

The Ministry of Health, Labor and Welfare mandated the creation of the business continuity plan (BCP) for disaster key hospitals on March 31, 2017. Supposing the hospital information system (HIS) failure occurred, the picture archiving and communication system (PACS) also suffers obstacles, we assumed building a new network was necessary for radiological examination images. The purpose of this study was to investigate whether building a new network for radiological examination images is necessary in an emergency. Using wireless fidelity (Wi-Fi), the new network consisting of one image server and two tablet terminals A and B was constructed. The study measured the portable image transfer time for various stages of the network. The results were as follows: Transfer time from the mobile X-ray unit to the image server was 4.12±0.86 s, that from the image server to the tablet device A was 5.14±0.71 s, and that from the image server to the tablet device B was 7.32±1.66 s. Therefore, the new network configuration can provide a reliable means of accessing radiological images during emergency situations when the HIS and PACS may experience obstacles or failures.


Assuntos
Sistemas de Informação em Radiologia , Desastres , Sistemas de Informação Hospitalar , Planejamento em Desastres/métodos , Humanos
SELEÇÃO DE REFERÊNCIAS
DETALHE DA PESQUISA